百事论坛   本站首页   贵湖华人   主题论坛   滑铁卢黄页 
Open in thread        

  • Phase One would link downtown Toronto to Pearson Airport and the high-tech hub of Kitchener-Waterloo at speeds of up to 250 km/h, ending in London. 因为政治省际高铁取消,因为TTC政治,市际铁路中止。只有滑铁卢高科技线一支独秀 (水城百事)

by 滑梯路获得官方地位 高科技中心。, Thursday, May 25, 2017, 17:31

https://www.thestar.com/news/queenspark/2017/05/24/why-high-speed-rail-switched-from-montreal-to-kitchener-waterloo-cohn.html

  119 views



登录后可以通过微信/Facebook/Twitter/email进行分享

Complete thread:

 RSS Feed of thread




1314065 Postings in 191044 Threads, 2660 registered users, 486 users online (2 registered, 484 guests)
滑铁卢华人|KWCG生活论坛-Kitchener, Waterloo, Cambridge & Guelph华人的网上家园