-
Phase One would link downtown Toronto to Pearson Airport and the high-tech hub of Kitchener-Waterloo at speeds of up to 250 km/h, ending in London. 因为政治省际高铁取消,因为TTC政治,市际铁路中止。只有滑铁卢高科技线一支独秀 (水城百事)
119 views
|
登录后可以通过微信/Facebook/Twitter/email进行分享
Complete thread:
- Phase One would link downtown Toronto to Pearson Airport and the high-tech hub of Kitchener-Waterloo at speeds of up to 250 km/h, ending in London. 因为政治省际高铁取消,因为TTC政治,市际铁路中止。只有滑铁卢高科技线一支独秀 - 滑梯路获得官方地位 高科技中心。 ; 17-05-25,17:31 (#557293) Reply (水城百事)